See how our manufacturing partner handles design, machining, assembly, trials and inspection. The equipment and process ranges below describe the workshop supporting your project.

Mold Design

Mold Design in UG / CAD

Every mold begins with design work in Siemens NX / UG, with 2D drawings in AutoCAD. The workshop engineers review manufacturability, parting, gating, ejection and cooling before machining starts.

  • DFM review before quote confirmation
  • Parting line, gate location and gate type (side / submarine / pin-point)
  • Ejection plan — pin, blade, sleeve, lifter
  • Cooling plan — line diameter, baffles, spiral cooling where needed
  • Slider and lifter design, angle and travel
  • Buyer sign-off on 3D mold layout before machining starts
Detailed view of open mold cavity
CNC Machining

Supported by Long-Term Partners

CNC machining is supported by long-term machining partners under our process and quality control. These are shops we have worked with for years — not a random subcontractor for each job.

  • CAM programming reviewed by the tooling engineers
  • Tool paths agreed for critical surfaces before cutting
  • Every returned part inspected against the drawing before fitting
  • Traceable material and heat treatment records
Process control: CNC machining is coordinated with established machining partners. Returned components are inspected against the drawing before fitting and assembly.
Finished mold bases stacked in storage after machining
EDM, Fitting & Assembly

EDM, Fitting and Assembly at the Workshop

The steps that most affect mold life and part quality are all at the tooling workshop. This is where 25 years of workshop experience actually shows.

  • Sinker EDM — ribs, sharp corners, logos, text
  • Wire EDM — ejector holes, precision slots, inserts
  • Fitting — parting line, shut-offs, slider faces by hand
  • Assembly — mold base + core + cavity + slider + lifter + ejector + cooling
  • Polishing — from SPI-A3 to optical polish for PC / PMMA lenses
  • Correction after T1 — welding, re-cutting, insert changes as needed
EDM and fitting bay in the workshop
Trial Molding

90T – 200T Trial Molding at the Workshop

Every mold is tried at the tooling workshop before it ships. The production line covers 90-ton to 200-ton machines, matched to the mold size we build. Robots handle unloading on the machines where they are useful.

  • T1 first-shot trial with process record
  • Trial video showing mold opening, ejection, part release
  • Sample parts labeled and packed with the tool
  • T2 / T3 trials after corrections when needed
  • Buyer sign-off on samples before shipment
Line of injection molding machines with robots
Inspection

Documented, Not Assumed

Inspection happens at three points: on machined parts before fitting, on the assembled mold before T1, and on trial parts before shipment. The paperwork ships with the tool.

  • CMM inspection of critical part dimensions
  • Cavity and core dimensional check against 3D reference
  • Appearance check on trial parts (weld lines, sink, flow marks)
  • Assembly check — every action cycled by hand and under power
  • Final inspection before packing
Finished molds packed and waiting for shipment
Equipment Summary

Where Each Manufacturing Step Happens

StepWhere it runs
Mold design (UG / NX + AutoCAD)Tooling workshop
Steel selection & procurementTooling workshop, long-term suppliers
CNC rough & finish machiningLong-term partner shops, under our control
Sinker EDMTooling workshop
Wire EDMTooling workshop
FittingTooling workshop
Polishing (up to optical polish)Tooling workshop
AssemblyTooling workshop
Trial molding (90T – 200T)Tooling workshop
Inspection & CMMTooling workshop
Wooden case packingTooling workshop
Shipping & customs paperworkTooling workshop sales + long-term forwarder

Want to see the workshop?

We can arrange a video walk-through of the workshop and equipment before you commit to a first project.

Request a Quote